1 | Hello,
|
---|
2 |
|
---|
3 | I send you the latest time table of the COLLECTOR WP (6 april 03).
|
---|
4 |
|
---|
5 | In the pre-BENE phase there is the preparation of the Design Studies.
|
---|
6 |
|
---|
7 | In the COLLECTOR time table, I have factorised the Join COLLECTOR & TARGET
|
---|
8 | meetings in the first part of the table and Vittorio agrees that it is more efficient to present
|
---|
9 | like that.
|
---|
10 | In the second part of the table, there are key points:
|
---|
11 | 1. The Collector Test Area (CTA) proposal oct 2004: the idea is that after presenting the
|
---|
12 | DS, we need certainly some preliminary R&Ds to be able to draw some reasonable
|
---|
13 | CTA.
|
---|
14 | 2. The Status Report on the CTA: it occurs ~sep. 2005, that is to say 1 year after the
|
---|
15 | CTA proposal. The idea is that at that date we may have all the element to build a
|
---|
16 | second generation HORN prototype (CERN prototype is 1st generation) with all the
|
---|
17 | drawing, ready to launch the fabrication to be able to get something in 2006.
|
---|
18 | 3. The SuperBeam solution report: (end of 2006). After the CTA building and series of
|
---|
19 | Test we may be in position to validate the choices to propose a viable solution for
|
---|
20 | SPL/Frejus SuperBeam. This allows us to make the final tunig in 2007 to be ready for
|
---|
21 | the experiment calendar.
|
---|
22 | 4. The NuFact solution report (early 2008): the idea is beyond the SuperBeam solution
|
---|
23 | we should conclude if the HORN is a viable solution for the NuFact. The CTA and
|
---|
24 | other R&Ds (in the world) should be able to answer at the time.
|
---|
25 | 5. The final report (end 2008) should be the conclusion of the Network Activity with the
|
---|
26 | summary of the two solutions (SuperBeam/NuFact).
|
---|
27 |
|
---|
28 | In the mean while there are dates in 2005 if we need other DS, and they are yearly status
|
---|
29 | reports on the: electrical power supply studies, mechanical/thermal studies, irradiated material
|
---|
30 | studies.
|
---|
31 |
|
---|
32 | Also , there are 2 international workshops TARGET & COLLECTOR:: March 2005 and
|
---|
33 | march 2007. Vittorio suggests that these Workshops take place in October rather that March
|
---|
34 | which is already crowded, and may be RAL would be the right place.
|
---|
35 |
|
---|
36 | What do you think about that? DEAD LINE 7th APRIL evening.
|
---|
37 |
|
---|
38 | Roger, I invite you to factorise the meeting as I have done and may be the easiest way would
|
---|
39 | be to copy and paste my table and add/remove items to show specific TARGET items. What
|
---|
40 | about the Vottorio suggestion about the Int. Workshops date and place?
|
---|
41 |
|
---|
42 |
|
---|
43 | Cheers,
|
---|
44 | Jean-Eric
|
---|