| 3 | I send you the latest time table of the COLLECTOR WP (6 april 03). | 
|---|
| 4 |  | 
|---|
| 5 | In the pre-BENE phase there is the preparation of the Design Studies. | 
|---|
| 6 |  | 
|---|
| 7 | In the COLLECTOR time table, I have factorised the Join COLLECTOR & TARGET | 
|---|
| 8 | meetings in the  first part of the table and Vittorio agrees that it is more efficient to present | 
|---|
| 9 | like that. | 
|---|
| 10 | In the second part of the table, there are key points: | 
|---|
| 11 | 1.      The Collector Test Area (CTA) proposal oct 2004: the idea is that after presenting the | 
|---|
| 12 | DS, we need certainly some preliminary R&Ds to be able to draw some reasonable | 
|---|
| 13 | CTA. | 
|---|
| 14 | 2.      The Status Report on the CTA: it occurs  ~sep. 2005, that is to say 1 year after the | 
|---|
| 15 | CTA proposal. The idea is that at that date we may have all the element to build a | 
|---|
| 16 | second generation HORN prototype (CERN prototype is 1st generation) with all the | 
|---|
| 17 | drawing, ready to launch the fabrication to be able to get something in 2006. | 
|---|
| 18 | 3.      The  SuperBeam solution report: (end of 2006). After the CTA building and series of | 
|---|
| 19 | Test we may be in position to validate the choices to propose a viable solution for | 
|---|
| 20 | SPL/Frejus SuperBeam. This allows us to make the final tunig in 2007 to be ready for | 
|---|
| 21 | the experiment calendar. | 
|---|
| 22 | 4.      The NuFact solution report (early 2008): the idea is beyond the SuperBeam solution | 
|---|
| 23 | we should conclude if the HORN is a viable solution for the NuFact. The CTA and | 
|---|
| 24 | other R&Ds (in the world) should be able to answer at the time. | 
|---|
| 25 | 5.      The final report (end 2008) should be the conclusion of the Network Activity with the | 
|---|
| 26 | summary of the two solutions (SuperBeam/NuFact). | 
|---|
| 27 |  | 
|---|
| 28 | In the mean while there are dates in 2005 if we need other DS, and they are yearly status | 
|---|
| 29 | reports on the: electrical power supply studies, mechanical/thermal studies, irradiated material | 
|---|
| 30 | studies. | 
|---|
| 31 |  | 
|---|
| 32 | Also , there are 2 international workshops TARGET & COLLECTOR:: March 2005 and | 
|---|
| 33 | march 2007. Vittorio suggests that these Workshops take place in October rather that March | 
|---|
| 34 | which is already crowded, and may be RAL would be the right place. | 
|---|
| 35 |  | 
|---|
| 36 | What do you think about that? DEAD LINE 7th APRIL evening. | 
|---|
| 37 |  | 
|---|
| 38 | Roger, I invite you to factorise the meeting as I have done and may be the easiest way would | 
|---|
| 39 | be to copy and paste my table and add/remove items  to  show specific TARGET items. What | 
|---|
| 40 | about the Vottorio suggestion about the Int. Workshops date and place? | 
|---|
| 41 |  | 
|---|
| 42 |  | 
|---|