 | 11 | <li>
 | 
|---|
 | 12 | <b>High power collection systems (horns, solenoids, etc)</b><i>  </i>Coordinator<b> 
 | 
|---|
 | 13 | J. E. Campagne (LAL) </b><i> </i>shortname: <b>COLLECTOR</b></li>
 | 
|---|
 | 14 | 
 | 
|---|
 | 15 | <table BORDER CELLSPACING=2 CELLPADDING=2 WIDTH="100%" >
 | 
|---|
 | 16 | <caption><tbody>
 | 
|---|
 | 17 | <br></tbody></caption>
 | 
|---|
 | 18 | 
 | 
|---|
 | 19 | <tr>
 | 
|---|
 | 20 | <td><font color="#000000">The major motivation of a Network Activity and
 | 
|---|
 | 21 | also R&D studies in this field  is that the collection system
 | 
|---|
 | 22 | for the future neutrino beams will have to keep up with unprecendent challenging
 | 
|---|
 | 23 | conditions as such as 1) more than one order magnitude more electric stresses
 | 
|---|
 | 24 | (expressed in A.Hz) than the MiniBOON Horn and  more than two orders
 | 
|---|
 | 25 | of magnitudes than the present K2K Horn and the future NuMI and CNGS Horns
 | 
|---|
 | 26 | and 2) a huge rapid neutron flux 10^22n/cm^2/6weeks due to the necessary 
 | 
|---|
 | 27 | integration of the TARGET inside the COLLECTOR system. The NA will attack
 | 
|---|
 | 28 | the challenge by</font>
 | 
|---|
 | 29 | <ul>
 | 
|---|
 | 30 | <li>
 | 
|---|
 | 31 | Defining, in collaboration with the TARGET team,  a viable solution
 | 
|---|
 | 32 | to all the integration problems imposed by the need of locating the target
 | 
|---|
 | 33 | inside the collector: neutron radiation, heat load...</li>
 | 
|---|
 | 34 | 
 | 
|---|
 | 35 | <li>
 | 
|---|
 | 36 | Comparing focusing and collection capabilities of the few main options
 | 
|---|
 | 37 | of collection systems, as simulated by the few main existing codes</li>
 | 
|---|
 | 38 | 
 | 
|---|
 | 39 | <li>
 | 
|---|
 | 40 | Conducting particle production and collection simulations using different
 | 
|---|
 | 41 | Monte Carlo programs: GEANT, MARS,... </li>
 | 
|---|
 | 42 | 
 | 
|---|
 | 43 | <li>
 | 
|---|
 | 44 | Conducting simulation of  thermal and mechanical stresses of the collection
 | 
|---|
 | 45 | systems to define the critical points </li>
 | 
|---|
 | 46 | 
 | 
|---|
 | 47 | <li>
 | 
|---|
 | 48 | Studing resistance of different materials proposed  for collectors
 | 
|---|
 | 49 | operating under severe radiation conditions</li>
 | 
|---|
 | 50 | 
 | 
|---|
 | 51 | <li>
 | 
|---|
 | 52 | Studing the cooling system to optimize  the operating heating temperature
 | 
|---|
 | 53 | of the alloy </li>
 | 
|---|
 | 54 | 
 | 
|---|
 | 55 | <li>
 | 
|---|
 | 56 | Estimating reliably  lifetime expectations under unprecedented operation
 | 
|---|
 | 57 | conditions (highly radioactive enviroments at high repetetition rate). </li>
 | 
|---|
 | 58 | 
 | 
|---|
 | 59 | <li>
 | 
|---|
 | 60 | Proposing R&D projects and establishing collaborations for the design
 | 
|---|
 | 61 | and test of horns and other collection systems, as they are likely to evolve
 | 
|---|
 | 62 | to cope with increasingly severe conditions, from the present conventional
 | 
|---|
 | 63 | beams up to full power neutrino factories </li>
 | 
|---|
 | 64 | </ul>
 | 
|---|
 | 65 | </td>
 | 
|---|
 | 66 | </tr>
 | 
|---|
 | 67 | </table>
 | 
|---|
 | 68 | 
 | 
|---|
 | 69 | <p><font color="#009900"><font size=+3>Attempt to modify the content of
 | 
|---|
 | 70 | the CONTRACTING PARTICIPANTS tables: IN2P3</font></font>
 | 
|---|
 | 71 | <p><font size=-1>The Institut will coordinate a consortium including physicists
 | 
|---|
 | 72 | from French CNRS and University Laboratories  (IPN Lyon, LAL, LPNHE
 | 
|---|
 | 73 | Paris VI&VII) contributing long term expertise in the field of neutrino
 | 
|---|
 | 74 | <b>PHYSICS,
 | 
|---|
 | 75 | </b>experiments
 | 
|---|
 | 76 | &  beams. It expects then to contribute to the
 | 
|---|
 | 77 | <b>general </b>steering
 | 
|---|
 | 78 | and provide technical expertise in the field of
 | 
|---|
 | 79 | <b>COLLECTOR </b>technology
 | 
|---|
 | 80 | design studies. (<b><font color="#CC0000">BETABEAM ????</font></b> )</font>
 | 
|---|
 | 81 | <br> 
 | 
|---|
 | 82 | <p><font color="#009900"><font size=+3>Deliverables and relevant milestones:</font></font>
 | 
|---|
 | 83 | <br><b>COLLECTOR</b>
 | 
|---|
 | 84 | <br>The first deliverable for Summer 2004 will be a status report (R1)
 | 
|---|
 | 85 | on existing collection systems used in the past and currently in operation
 | 
|---|
 | 86 | (MiniBOON/K2K) and in construction (NuMI/CNGS). Then, till end 2006, studies
 | 
|---|
 | 87 | will be condcuted,  to produce a detail report (R2) on a specific
 | 
|---|
 | 88 | solution for the SuperBeam project. Then, till the end of the NA Jan. 2008,
 | 
|---|
 | 89 | it is foreseen to produce a detail report (R3) on the different solutions
 | 
|---|
 | 90 | that will be avaliable for the Neutrino Factory project.
 | 
|---|
 | 91 | <p>The 2 last reports  (R2 and R3) will be based on
 | 
|---|
 | 92 | <blockquote>
 | 
|---|
 | 93 | <ol>
 | 
|---|
 | 94 | <li>
 | 
|---|
 | 95 | a detailed particle collection simulations (Monte Carlo based simulations
 | 
|---|
 | 96 | with state-of-the art code: GEANT4, MARS,...),</li>
 | 
|---|
 | 97 | 
 | 
|---|
 | 98 | <li>
 | 
|---|
 | 99 | thermo-mechanical simulations that implies for instence to experimentally
 | 
|---|
 | 100 | measure some relevant parameters (heat diffusion coefficients, stress limit
 | 
|---|
 | 101 | under high neutron fluxes and after 10^8 cycles...),</li>
 | 
|---|
 | 102 | 
 | 
|---|
 | 103 | <li>
 | 
|---|
 | 104 | complete technical specifications of electric power supply and discharge
 | 
|---|
 | 105 | equipment</li>
 | 
|---|
 | 106 | 
 | 
|---|
 | 107 | <li>
 | 
|---|
 | 108 | state-of -the art knowledge of mechanical properties of alloys under high
 | 
|---|
 | 109 | rate neutron irradiation as already mentionned.</li>
 | 
|---|
 | 110 | </ol>
 | 
|---|
 | 111 | </blockquote>
 | 
|---|
 | 112 | They  will include proposition of specific solutions or R&D to
 | 
|---|
 | 113 | be conducted  necessary to achieve a lifetime of such system of few
 | 
|---|
 | 114 | 100 Mega cycles or more. For instance, the documents will address solutions
 | 
|---|
 | 115 | <ul>
 | 
|---|
 | 116 | <li>
 | 
|---|
 | 117 | to the choices of material for the collection device,</li>
 | 
|---|
 | 118 | 
 | 
|---|
 | 119 | <li>
 | 
|---|
 | 120 | of machining, soldering and assembling techniques,</li>
 | 
|---|
 | 121 | 
 | 
|---|
 | 122 | <li>
 | 
|---|
 | 123 | of  heat removal and cooling system,</li>
 | 
|---|
 | 124 | 
 | 
|---|
 | 125 | <li>
 | 
|---|
 | 126 |  to the problems of TARGET integration in the collection system</li>
 | 
|---|
 | 127 | 
 | 
|---|
 | 128 | <li>
 | 
|---|
 | 129 | and of  periodic replacement in a high radioactive environment.</li>
 | 
|---|
 | 130 | </ul>
 | 
|---|
 | 131 | Other deliverables will be intermediate specialized notes and worshop proceedings
 | 
|---|
 | 132 | that will be used for the final
 | 
|---|
 | 133 | <br>document, and simulation programs that will be worth to develop for
 | 
|---|
 | 134 | these studies.
 | 
|---|
 | 135 | <br> 
 | 
|---|
 | 136 | <p><b><font size=+2>5 Year Schedule <i><font color="#CC0000">(from Roger)</font></i></font></b>
 | 
|---|
 | 137 | <p>Spring 2004 Initial meeting of the Target and Collector Sections. Allotment
 | 
|---|
 | 138 | of specific duties.
 | 
|---|
 | 139 | <p>Summer 2004 1st Main Meeting (with international participants) to present
 | 
|---|
 | 140 | the current progress in target and collector studies.
 | 
|---|
 | 141 | <p>Winter 2004 <font color="#CC0000">Publication of the current position
 | 
|---|
 | 142 | of target and collector development.</font>
 | 
|---|
 | 143 | <br><font color="#CC0000">Preliminary recommendations for future R&D.</font>
 | 
|---|
 | 144 | <p>Summer 2005  1st International Conference on Targets and Collectors.
 | 
|---|
 | 145 | <p>Spring 2006  Publication of Conference Proceedings.
 | 
|---|
 | 146 | <br>/Summer  2nd Main meeting of the Target and Collector Sections.
 | 
|---|
 | 147 | <p>Autumn 2006 <font color="#FF0000">Publication of interim report on Target
 | 
|---|
 | 148 | and Collector developments.</font>
 | 
|---|
 | 149 | <br><font color="#FF0000">   Recommendations for future R&D.</font>
 | 
|---|
 | 150 | <p>Summer 2007  2nd International Conference on Targets and Collectors.
 | 
|---|
 | 151 | <p>Spring 2008  Publication of Conference Proceedings.
 | 
|---|
 | 152 | <br>/Summer 3rd Main and final meeting of the Target and Collector Sections.
 | 
|---|
 | 153 | <p>Winter 2008 <font color="#FF0000">Final report and recommendations of
 | 
|---|
 | 154 | the Target and Collector Sections.</font><font color="#FF0000"></font>
 | 
|---|
 | 155 | <p><b><font size=+2>Plans for the following 18th monthes COLLECTOR</font></b>
 | 
|---|
 | 156 | <br>Before the NA will start:
 | 
|---|
 | 157 | <ul>
 | 
|---|
 | 158 | <ul>
 | 
|---|
 | 159 | <li>
 | 
|---|
 | 160 | report on 6000 type alloy caracteristics on mecanical properties under
 | 
|---|
 | 161 | high intensity neutron flux based on bibliographic documentation</li>
 | 
|---|
 | 162 | 
 | 
|---|
 | 163 | <li>
 | 
|---|
 | 164 | initiate collaboration with French-CEA for stress limit measurement of
 | 
|---|
 | 165 | 6000 type alloy under high level of neutron flux.</li>
 | 
|---|
 | 166 | 
 | 
|---|
 | 167 | <li>
 | 
|---|
 | 168 | report on analytic solutions of the Horn thermal/mecanical design</li>
 | 
|---|
 | 169 | 
 | 
|---|
 | 170 | <li>
 | 
|---|
 | 171 | start of  thermal/mecanical simulation of the Horn for a SuperBeam
 | 
|---|
 | 172 | project</li>
 | 
|---|
 | 173 | 
 | 
|---|
 | 174 | <li>
 | 
|---|
 | 175 | first report on electric power design of the Horn for SuperBeam project</li>
 | 
|---|
 | 176 | 
 | 
|---|
 | 177 | <li>
 | 
|---|
 | 178 | proposal for Horn prototype building as Design Studies Technical Work Project</li>
 | 
|---|
 | 179 | </ul>
 | 
|---|
 | 180 | 
 | 
|---|
 | 181 | <li>
 | 
|---|
 | 182 | Spring 2004</li>
 | 
|---|
 | 183 | 
 | 
|---|
 | 184 | <ul>
 | 
|---|
 | 185 | <li>
 | 
|---|
 | 186 | first guide of the collection systems used in the past, present and near
 | 
|---|
 | 187 | future (along R1 publication): mechanical stresses and design, electric
 | 
|---|
 | 188 | power caracteristics and design, heat dissipation system design, failure
 | 
|---|
 | 189 | description, lifetime in operation</li>
 | 
|---|
 | 190 | 
 | 
|---|
 | 191 | <li>
 | 
|---|
 | 192 | <font color="#000000">status report of the CERN Horn prototype</font></li>
 | 
|---|
 | 193 | 
 | 
|---|
 | 194 | <li>
 | 
|---|
 | 195 | reports on other mechanical tests as diffusion coefficient measurements</li>
 | 
|---|
 | 196 | 
 | 
|---|
 | 197 | <li>
 | 
|---|
 | 198 | integration of preliminary TARGET parameters on thermal/mecanical simulation
 | 
|---|
 | 199 | of the Horn for a SuperBeam project</li>
 | 
|---|
 | 200 | 
 | 
|---|
 | 201 | <li>
 | 
|---|
 | 202 | first drawing design of a new Horn prototype</li>
 | 
|---|
 | 203 | </ul>
 | 
|---|
 | 204 | 
 | 
|---|
 | 205 | <li>
 | 
|---|
 | 206 | Summer 2004</li>
 | 
|---|
 | 207 | 
 | 
|---|
 | 208 | <ul>
 | 
|---|
 | 209 | <li>
 | 
|---|
 | 210 | R1 repport production</li>
 | 
|---|
 | 211 | 
 | 
|---|
 | 212 | <li>
 | 
|---|
 | 213 | status report on thermo/mechanical simulations</li>
 | 
|---|
 | 214 | 
 | 
|---|
 | 215 | <li>
 | 
|---|
 | 216 | status report on electric power design to deliver 300kA/50Hz</li>
 | 
|---|
 | 217 | </ul>
 | 
|---|
 | 218 | 
 | 
|---|
 | 219 | <li>
 | 
|---|
 | 220 | Spring 2005</li>
 | 
|---|
 | 221 | 
 | 
|---|
 | 222 | <ul>
 | 
|---|
 | 223 | <li>
 | 
|---|
 | 224 | first result on stress limit measurement of irradiated materials</li>
 | 
|---|
 | 225 | 
 | 
|---|
 | 226 | <li>
 | 
|---|
 | 227 | final design of a new Horn prototype to launch realisation</li>
 | 
|---|
 | 228 | </ul>
 | 
|---|
 | 229 | </ul>
 | 
|---|
 | 230 | Afterwards their will be prototype realisation by the Design Studies TWP
 | 
|---|
 | 231 | and measurement campain that will end by the writing of R2. Then, new work
 | 
|---|
 | 232 | will be undertaken by DS TWP in the line of R3 report goal.
 | 
|---|