| [406] | 1 | <!doctype html public "-//w3c//dtd html 4.0 transitional//en"> | 
|---|
|  | 2 | <html> | 
|---|
|  | 3 | <head> | 
|---|
|  | 4 | <meta http-equiv="Content-Type" content="text/html; charset=iso-8859-1"> | 
|---|
|  | 5 | <meta name="Author" content="Jean-Eric Campagne"> | 
|---|
|  | 6 | <meta name="GENERATOR" content="Mozilla/4.75 [fr] (Windows NT 5.0; U) [Netscape]"> | 
|---|
|  | 7 | <title>NA_COLLECTOR</title> | 
|---|
|  | 8 | </head> | 
|---|
|  | 9 | <body> | 
|---|
|  | 10 |  | 
|---|
|  | 11 | <li> | 
|---|
|  | 12 | <b>High power collection systems (horns, solenoids, etc)</b><i>  </i>Coordinator<b>  | 
|---|
|  | 13 | J. E. Campagne (LAL) </b><i> </i>shortname: <b>COLLECTOR</b></li> | 
|---|
|  | 14 |  | 
|---|
|  | 15 | <table BORDER CELLSPACING=2 CELLPADDING=2 WIDTH="100%" > | 
|---|
|  | 16 | <caption><tbody> | 
|---|
|  | 17 | <br></tbody></caption> | 
|---|
|  | 18 |  | 
|---|
|  | 19 | <tr> | 
|---|
|  | 20 | <td><font color="#000000">The major motivation of a Network Activity and | 
|---|
|  | 21 | also R&D studies in this field  is that the collection system | 
|---|
|  | 22 | for the future neutrino beams will have to keep up with unprecendent challenging | 
|---|
|  | 23 | conditions as such as 1) more than one order magnitude more electric stresses | 
|---|
|  | 24 | (expressed in A.Hz) than the </font><font color="#FF0000">MiniBOONE</font><font color="#000000"> | 
|---|
|  | 25 | Horn and  more than two orders of magnitudes than the present K2K | 
|---|
|  | 26 | Horn and the future NuMI and CNGS Horns and 2) a huge rapid neutron flux | 
|---|
|  | 27 | 10^22n/cm^2/6weeks due to the necessary  integration of the TARGET | 
|---|
|  | 28 | inside the COLLECTOR system. The NA will attack the challenge by</font> | 
|---|
|  | 29 | <ul> | 
|---|
|  | 30 | <li> | 
|---|
|  | 31 | Defining, in collaboration with the TARGET team,  a viable solution | 
|---|
|  | 32 | to all the integration problems imposed by the need of locating the target | 
|---|
|  | 33 | inside the collector: neutron radiation, heat load,<font color="#FF0000"> | 
|---|
|  | 34 | target exchange</font>...</li> | 
|---|
|  | 35 |  | 
|---|
|  | 36 | <li> | 
|---|
|  | 37 | Comparing focusing and collection capabilities of the few main options | 
|---|
|  | 38 | of collection systems, as simulated by the few main existing codes</li> | 
|---|
|  | 39 |  | 
|---|
|  | 40 | <li> | 
|---|
|  | 41 | Conducting particle production and collection simulations using different | 
|---|
|  | 42 | Monte Carlo programs: GEANT, <strike><font color="#FF0000">MARS</font></strike>,... </li> | 
|---|
|  | 43 |  | 
|---|
|  | 44 | <li> | 
|---|
|  | 45 | Conducting simulation of  thermal and mechanical stresses of the collection | 
|---|
|  | 46 | systems to define the critical points </li> | 
|---|
|  | 47 |  | 
|---|
|  | 48 | <li> | 
|---|
|  | 49 | Studing resistance of different materials proposed  for collectors | 
|---|
|  | 50 | operating under severe radiation conditions</li> | 
|---|
|  | 51 |  | 
|---|
|  | 52 | <li> | 
|---|
|  | 53 | Studing the cooling system to optimize  the operating heating temperature | 
|---|
|  | 54 | of the alloy </li> | 
|---|
|  | 55 |  | 
|---|
|  | 56 | <li> | 
|---|
|  | 57 | Estimating reliably  lifetime expectations under unprecedented operation | 
|---|
|  | 58 | conditions (highly radioactive enviroments at high repetetition rate). </li> | 
|---|
|  | 59 |  | 
|---|
|  | 60 | <li> | 
|---|
|  | 61 | Proposing R&D projects and establishing collaborations for the design | 
|---|
|  | 62 | and test of horns and other collection systems, as they are likely to evolve | 
|---|
|  | 63 | to cope with increasingly severe conditions, from the present conventional | 
|---|
|  | 64 | beams up to full power neutrino factories </li> | 
|---|
|  | 65 | </ul> | 
|---|
|  | 66 | </td> | 
|---|
|  | 67 | </tr> | 
|---|
|  | 68 | </table> | 
|---|
|  | 69 |  | 
|---|
|  | 70 | <p><font color="#009900"><font size=+3>Attempt to modify the content of | 
|---|
|  | 71 | the CONTRACTING PARTICIPANTS tables: IN2P3</font></font> | 
|---|
|  | 72 | <p><font size=-1>The Institut will coordinate a consortium including physicists | 
|---|
|  | 73 | from French CNRS and University Laboratories  (IPN Lyon, LAL, LPNHE | 
|---|
|  | 74 | Paris VI&VII) contributing long term expertise in the field of neutrino | 
|---|
|  | 75 | <b>PHYSICS, | 
|---|
|  | 76 | </b>experiments | 
|---|
|  | 77 | &  beams. It expects then to contribute to the | 
|---|
|  | 78 | <b>general </b>steering | 
|---|
|  | 79 | and provide technical expertise in the field of | 
|---|
|  | 80 | <b>COLLECTOR </b>technology | 
|---|
|  | 81 | design studies. (<b><font color="#CC0000">BETABEAM ????</font></b> )</font> | 
|---|
|  | 82 | <br>  | 
|---|
|  | 83 | <p><font color="#009900"><font size=+3>Deliverables and relevant milestones:</font></font> | 
|---|
|  | 84 | <br><b>COLLECTOR</b> | 
|---|
|  | 85 | <br>The first deliverable for Summer 2004 will be a status report (R1) | 
|---|
|  | 86 | on existing collection systems used in the past and currently in operation | 
|---|
|  | 87 | (<font color="#FF0000">MiniBOONE</font>/K2K) and in construction (NuMI/CNGS) | 
|---|
|  | 88 | a<font color="#FF0000">nd the review of the current status of the collector | 
|---|
|  | 89 | study done so far for the SuperBeam/Neutrino Factory</font>.. Then, till | 
|---|
|  | 90 | end 2006, studies will be condcuted,  to produce a detail report (R2) | 
|---|
|  | 91 | on a specific solution for the SuperBeam project. Then, till the end of | 
|---|
|  | 92 | the NA Jan. 2008, it is foreseen to produce a detail report (R3) on the | 
|---|
|  | 93 | different solutions that will be avaliable for the Neutrino Factory project. | 
|---|
|  | 94 | <p>The 2 last reports  (R2 and R3) will be based on | 
|---|
|  | 95 | <blockquote> | 
|---|
|  | 96 | <ol> | 
|---|
|  | 97 | <li> | 
|---|
|  | 98 | a detailed particle <font color="#FF0000">production and</font> collection | 
|---|
|  | 99 | simulations (Monte Carlo based simulations with state-of-the art code: | 
|---|
|  | 100 | GEANT<strike><font color="#FF0000">4</font></strike>, <strike><font color="#FF0000">MARS</font></strike>,...),</li> | 
|---|
|  | 101 |  | 
|---|
|  | 102 | <li> | 
|---|
|  | 103 | thermo-mechanical simulations that implies for instence to experimentally | 
|---|
|  | 104 | measure some relevant parameters (heat diffusion coefficients, stress limit | 
|---|
|  | 105 | under high neutron fluxes and after 10^8 cycles...),</li> | 
|---|
|  | 106 |  | 
|---|
|  | 107 | <li> | 
|---|
|  | 108 | complete technical specifications of electric power supply and discharge | 
|---|
|  | 109 | equipment</li> | 
|---|
|  | 110 |  | 
|---|
|  | 111 | <li> | 
|---|
|  | 112 | state-of -the art knowledge of mechanical properties of alloys under high | 
|---|
|  | 113 | rate neutron irradiation as already mentionned.</li> | 
|---|
|  | 114 | </ol> | 
|---|
|  | 115 | </blockquote> | 
|---|
|  | 116 | They  will include proposition of specific solutions or R&D to | 
|---|
|  | 117 | be conducted  necessary to achieve a lifetime of such system of few | 
|---|
|  | 118 | 100 Mega cycles or more. For instance, the documents will address solutions | 
|---|
|  | 119 | <ul> | 
|---|
|  | 120 | <li> | 
|---|
|  | 121 | to the choices of material for the collection device,</li> | 
|---|
|  | 122 |  | 
|---|
|  | 123 | <li> | 
|---|
|  | 124 | of machining, soldering and assembling techniques,</li> | 
|---|
|  | 125 |  | 
|---|
|  | 126 | <li> | 
|---|
|  | 127 | of  heat removal and cooling system,</li> | 
|---|
|  | 128 |  | 
|---|
|  | 129 | <li> | 
|---|
|  | 130 |  to the problems of TARGET integration in the collection system</li> | 
|---|
|  | 131 |  | 
|---|
|  | 132 | <li> | 
|---|
|  | 133 | and of  periodic replacement in a high radioactive environment</li> | 
|---|
|  | 134 |  | 
|---|
|  | 135 | <li> | 
|---|
|  | 136 | <font color="#FF0000">final target station design.</font></li> | 
|---|
|  | 137 |  | 
|---|
|  | 138 | <br>  | 
|---|
|  | 139 | <p> </ul> | 
|---|
|  | 140 | Other deliverables will be intermediate specialized notes and worshop proceedings | 
|---|
|  | 141 | that will be used for the final | 
|---|
|  | 142 | <br>document, and simulation programs that will be worth to develop for | 
|---|
|  | 143 | these studies. | 
|---|
|  | 144 | <br>  | 
|---|
|  | 145 | <p><b><font size=+2>5 Year Schedule <i><font color="#CC0000">(from Roger)</font></i></font></b> | 
|---|
|  | 146 | <p>Spring 2004 Initial meeting of the Target and Collector Sections. Allotment | 
|---|
|  | 147 | of specific duties. | 
|---|
|  | 148 | <p>Summer 2004 1st Main Meeting (with international participants) to present | 
|---|
|  | 149 | the current progress in target and collector studies. | 
|---|
|  | 150 | <p>Winter 2004 <font color="#CC0000">Publication of the current position | 
|---|
|  | 151 | of target and collector development.</font> | 
|---|
|  | 152 | <br><font color="#CC0000">Preliminary recommendations for future R&D.</font> | 
|---|
|  | 153 | <p>Summer 2005  1st International Conference on Targets and Collectors. | 
|---|
|  | 154 | <p>Spring 2006  Publication of Conference Proceedings. | 
|---|
|  | 155 | <br>/Summer  2nd Main meeting of the Target and Collector Sections. | 
|---|
|  | 156 | <p>Autumn 2006 <font color="#FF0000">Publication of interim report on Target | 
|---|
|  | 157 | and Collector developments.</font> | 
|---|
|  | 158 | <br><font color="#FF0000">   Recommendations for future R&D.</font> | 
|---|
|  | 159 | <p>Summer 2007  2nd International Conference on Targets and Collectors. | 
|---|
|  | 160 | <p>Spring 2008  Publication of Conference Proceedings. | 
|---|
|  | 161 | <br>/Summer 3rd Main and final meeting of the Target and Collector Sections. | 
|---|
|  | 162 | <p>Winter 2008 <font color="#FF0000">Final report and recommendations of | 
|---|
|  | 163 | the Target and Collector Sections.</font> | 
|---|
|  | 164 | <p><b><font size=+2>Plans for the following 18th monthes COLLECTOR</font></b> | 
|---|
|  | 165 | <br>Before the NA will start: | 
|---|
|  | 166 | <ul> | 
|---|
|  | 167 | <ul> | 
|---|
|  | 168 | <li> | 
|---|
|  | 169 | report on 6000 type alloy caracteristics on mecanical properties under | 
|---|
|  | 170 | high intensity neutron flux based on bibliographic documentation</li> | 
|---|
|  | 171 |  | 
|---|
|  | 172 | <li> | 
|---|
|  | 173 | initiate collaboration with French-CEA for stress limit measurement of | 
|---|
|  | 174 | 6000 type alloy under high level of neutron flux.</li> | 
|---|
|  | 175 |  | 
|---|
|  | 176 | <li> | 
|---|
|  | 177 | report on analytic solutions of the Horn thermal/mecanical design</li> | 
|---|
|  | 178 |  | 
|---|
|  | 179 | <li> | 
|---|
|  | 180 | start of  thermal/mecanical simulation of the Horn for a SuperBeam | 
|---|
|  | 181 | project</li> | 
|---|
|  | 182 |  | 
|---|
|  | 183 | <li> | 
|---|
|  | 184 | first report on electric power design of the Horn for SuperBeam project</li> | 
|---|
|  | 185 |  | 
|---|
|  | 186 | <li> | 
|---|
|  | 187 | proposal for Horn prototype building as Design Studies Technical Work Project</li> | 
|---|
|  | 188 | </ul> | 
|---|
|  | 189 |  | 
|---|
|  | 190 | <li> | 
|---|
|  | 191 | Spring 2004</li> | 
|---|
|  | 192 |  | 
|---|
|  | 193 | <ul> | 
|---|
|  | 194 | <li> | 
|---|
|  | 195 | first guide of the collection systems used in the past, present and near | 
|---|
|  | 196 | future (along R1 publication): mechanical stresses and design, electric | 
|---|
|  | 197 | power caracteristics and design, heat dissipation system design, failure | 
|---|
|  | 198 | description, lifetime in operation</li> | 
|---|
|  | 199 |  | 
|---|
|  | 200 | <li> | 
|---|
|  | 201 | <font color="#000000">status report of the CERN Horn prototype</font></li> | 
|---|
|  | 202 |  | 
|---|
|  | 203 | <li> | 
|---|
|  | 204 | reports on other mechanical tests as diffusion coefficient measurements</li> | 
|---|
|  | 205 |  | 
|---|
|  | 206 | <li> | 
|---|
|  | 207 | integration of preliminary TARGET parameters on thermal/mecanical simulation | 
|---|
|  | 208 | of the Horn for a SuperBeam project</li> | 
|---|
|  | 209 |  | 
|---|
|  | 210 | <li> | 
|---|
|  | 211 | first drawing design of a new Horn prototype</li> | 
|---|
|  | 212 | </ul> | 
|---|
|  | 213 |  | 
|---|
|  | 214 | <li> | 
|---|
|  | 215 | Summer 2004</li> | 
|---|
|  | 216 |  | 
|---|
|  | 217 | <ul> | 
|---|
|  | 218 | <li> | 
|---|
|  | 219 | R1 repport production</li> | 
|---|
|  | 220 |  | 
|---|
|  | 221 | <li> | 
|---|
|  | 222 | status report on thermo/mechanical simulations</li> | 
|---|
|  | 223 |  | 
|---|
|  | 224 | <li> | 
|---|
|  | 225 | status report on electric power design to deliver 300kA/50Hz</li> | 
|---|
|  | 226 | </ul> | 
|---|
|  | 227 |  | 
|---|
|  | 228 | <li> | 
|---|
|  | 229 | Spring 2005</li> | 
|---|
|  | 230 |  | 
|---|
|  | 231 | <ul> | 
|---|
|  | 232 | <li> | 
|---|
|  | 233 | first result on stress limit measurement of irradiated materials</li> | 
|---|
|  | 234 |  | 
|---|
|  | 235 | <li> | 
|---|
|  | 236 | final design of a new Horn prototype to launch realisation</li> | 
|---|
|  | 237 | </ul> | 
|---|
|  | 238 | </ul> | 
|---|
|  | 239 | Afterwards their will be prototype realisation by the Design Studies TWP | 
|---|
|  | 240 | and measurement campain that will end by the writing of R2. Then, new work | 
|---|
|  | 241 | will be undertaken by DS TWP in the line of R3 report goal. | 
|---|
|  | 242 | </body> | 
|---|
|  | 243 | </html> | 
|---|