11 | <li>
|
---|
12 | <b>High power collection systems (horns, solenoids, etc)</b><i> </i>Coordinator<b>
|
---|
13 | J. E. Campagne (LAL) </b><i> </i>shortname: <b>COLLECTOR</b></li>
|
---|
14 |
|
---|
15 | <table BORDER CELLSPACING=2 CELLPADDING=2 WIDTH="100%" >
|
---|
16 | <caption><tbody>
|
---|
17 | <br></tbody></caption>
|
---|
18 |
|
---|
19 | <tr>
|
---|
20 | <td><font color="#000000">The major motivation of a Network Activity and
|
---|
21 | also R&D studies in this field is that the collection system
|
---|
22 | for the future neutrino beams will have to keep up with unprecendent challenging
|
---|
23 | conditions as such as 1) more than one order magnitude more electric stresses
|
---|
24 | (expressed in A.Hz) than the </font><font color="#FF0000">MiniBOONE</font><font color="#000000">
|
---|
25 | Horn and more than two orders of magnitudes than the present K2K
|
---|
26 | Horn and the future NuMI and CNGS Horns and 2) a huge rapid neutron flux
|
---|
27 | 10^22n/cm^2/6weeks due to the necessary integration of the TARGET
|
---|
28 | inside the COLLECTOR system. The NA will attack the challenge by</font>
|
---|
29 | <ul>
|
---|
30 | <li>
|
---|
31 | Defining, in collaboration with the TARGET team, a viable solution
|
---|
32 | to all the integration problems imposed by the need of locating the target
|
---|
33 | inside the collector: neutron radiation, heat load,<font color="#FF0000">
|
---|
34 | target exchange</font>...</li>
|
---|
35 |
|
---|
36 | <li>
|
---|
37 | Comparing focusing and collection capabilities of the few main options
|
---|
38 | of collection systems, as simulated by the few main existing codes</li>
|
---|
39 |
|
---|
40 | <li>
|
---|
41 | Conducting particle production and collection simulations using different
|
---|
42 | Monte Carlo programs: GEANT, <strike><font color="#FF0000">MARS</font></strike>,... </li>
|
---|
43 |
|
---|
44 | <li>
|
---|
45 | Conducting simulation of thermal and mechanical stresses of the collection
|
---|
46 | systems to define the critical points </li>
|
---|
47 |
|
---|
48 | <li>
|
---|
49 | Studing resistance of different materials proposed for collectors
|
---|
50 | operating under severe radiation conditions</li>
|
---|
51 |
|
---|
52 | <li>
|
---|
53 | Studing the cooling system to optimize the operating heating temperature
|
---|
54 | of the alloy </li>
|
---|
55 |
|
---|
56 | <li>
|
---|
57 | Estimating reliably lifetime expectations under unprecedented operation
|
---|
58 | conditions (highly radioactive enviroments at high repetetition rate). </li>
|
---|
59 |
|
---|
60 | <li>
|
---|
61 | Proposing R&D projects and establishing collaborations for the design
|
---|
62 | and test of horns and other collection systems, as they are likely to evolve
|
---|
63 | to cope with increasingly severe conditions, from the present conventional
|
---|
64 | beams up to full power neutrino factories </li>
|
---|
65 | </ul>
|
---|
66 | </td>
|
---|
67 | </tr>
|
---|
68 | </table>
|
---|
69 |
|
---|
70 | <p><font color="#009900"><font size=+3>Attempt to modify the content of
|
---|
71 | the CONTRACTING PARTICIPANTS tables: IN2P3</font></font>
|
---|
72 | <p><font size=-1>The Institut will coordinate a consortium including physicists
|
---|
73 | from French CNRS and University Laboratories (IPN Lyon, LAL, LPNHE
|
---|
74 | Paris VI&VII) contributing long term expertise in the field of neutrino
|
---|
75 | <b>PHYSICS,
|
---|
76 | </b>experiments
|
---|
77 | & beams. It expects then to contribute to the
|
---|
78 | <b>general </b>steering
|
---|
79 | and provide technical expertise in the field of
|
---|
80 | <b>COLLECTOR </b>technology
|
---|
81 | design studies. (<b><font color="#CC0000">BETABEAM ????</font></b> )</font>
|
---|
82 | <br>
|
---|
83 | <p><font color="#009900"><font size=+3>Deliverables and relevant milestones:</font></font>
|
---|
84 | <br><b>COLLECTOR</b>
|
---|
85 | <br>The first deliverable for Summer 2004 will be a status report (R1)
|
---|
86 | on existing collection systems used in the past and currently in operation
|
---|
87 | (<font color="#FF0000">MiniBOONE</font>/K2K) and in construction (NuMI/CNGS)
|
---|
88 | a<font color="#FF0000">nd the review of the current status of the collector
|
---|
89 | study done so far for the SuperBeam/Neutrino Factory</font>.. Then, till
|
---|
90 | end 2006, studies will be condcuted, to produce a detail report (R2)
|
---|
91 | on a specific solution for the SuperBeam project. Then, till the end of
|
---|
92 | the NA Jan. 2008, it is foreseen to produce a detail report (R3) on the
|
---|
93 | different solutions that will be avaliable for the Neutrino Factory project.
|
---|
94 | <p>The 2 last reports (R2 and R3) will be based on
|
---|
95 | <blockquote>
|
---|
96 | <ol>
|
---|
97 | <li>
|
---|
98 | a detailed particle <font color="#FF0000">production and</font> collection
|
---|
99 | simulations (Monte Carlo based simulations with state-of-the art code:
|
---|
100 | GEANT<strike><font color="#FF0000">4</font></strike>, <strike><font color="#FF0000">MARS</font></strike>,...),</li>
|
---|
101 |
|
---|
102 | <li>
|
---|
103 | thermo-mechanical simulations that implies for instence to experimentally
|
---|
104 | measure some relevant parameters (heat diffusion coefficients, stress limit
|
---|
105 | under high neutron fluxes and after 10^8 cycles...),</li>
|
---|
106 |
|
---|
107 | <li>
|
---|
108 | complete technical specifications of electric power supply and discharge
|
---|
109 | equipment</li>
|
---|
110 |
|
---|
111 | <li>
|
---|
112 | state-of -the art knowledge of mechanical properties of alloys under high
|
---|
113 | rate neutron irradiation as already mentionned.</li>
|
---|
114 | </ol>
|
---|
115 | </blockquote>
|
---|
116 | They will include proposition of specific solutions or R&D to
|
---|
117 | be conducted necessary to achieve a lifetime of such system of few
|
---|
118 | 100 Mega cycles or more. For instance, the documents will address solutions
|
---|
119 | <ul>
|
---|
120 | <li>
|
---|
121 | to the choices of material for the collection device,</li>
|
---|
122 |
|
---|
123 | <li>
|
---|
124 | of machining, soldering and assembling techniques,</li>
|
---|
125 |
|
---|
126 | <li>
|
---|
127 | of heat removal and cooling system,</li>
|
---|
128 |
|
---|
129 | <li>
|
---|
130 | to the problems of TARGET integration in the collection system</li>
|
---|
131 |
|
---|
132 | <li>
|
---|
133 | and of periodic replacement in a high radioactive environment</li>
|
---|
134 |
|
---|
135 | <li>
|
---|
136 | <font color="#FF0000">final target station design.</font></li>
|
---|
137 |
|
---|
138 | <br>
|
---|
139 | <p> </ul>
|
---|
140 | Other deliverables will be intermediate specialized notes and worshop proceedings
|
---|
141 | that will be used for the final
|
---|
142 | <br>document, and simulation programs that will be worth to develop for
|
---|
143 | these studies.
|
---|
144 | <br>
|
---|
145 | <p><b><font size=+2>5 Year Schedule <i><font color="#CC0000">(from Roger)</font></i></font></b>
|
---|
146 | <p>Spring 2004 Initial meeting of the Target and Collector Sections. Allotment
|
---|
147 | of specific duties.
|
---|
148 | <p>Summer 2004 1st Main Meeting (with international participants) to present
|
---|
149 | the current progress in target and collector studies.
|
---|
150 | <p>Winter 2004 <font color="#CC0000">Publication of the current position
|
---|
151 | of target and collector development.</font>
|
---|
152 | <br><font color="#CC0000">Preliminary recommendations for future R&D.</font>
|
---|
153 | <p>Summer 2005 1st International Conference on Targets and Collectors.
|
---|
154 | <p>Spring 2006 Publication of Conference Proceedings.
|
---|
155 | <br>/Summer 2nd Main meeting of the Target and Collector Sections.
|
---|
156 | <p>Autumn 2006 <font color="#FF0000">Publication of interim report on Target
|
---|
157 | and Collector developments.</font>
|
---|
158 | <br><font color="#FF0000"> Recommendations for future R&D.</font>
|
---|
159 | <p>Summer 2007 2nd International Conference on Targets and Collectors.
|
---|
160 | <p>Spring 2008 Publication of Conference Proceedings.
|
---|
161 | <br>/Summer 3rd Main and final meeting of the Target and Collector Sections.
|
---|
162 | <p>Winter 2008 <font color="#FF0000">Final report and recommendations of
|
---|
163 | the Target and Collector Sections.</font>
|
---|
164 | <p><b><font size=+2>Plans for the following 18th monthes COLLECTOR</font></b>
|
---|
165 | <br>Before the NA will start:
|
---|
166 | <ul>
|
---|
167 | <ul>
|
---|
168 | <li>
|
---|
169 | report on 6000 type alloy caracteristics on mecanical properties under
|
---|
170 | high intensity neutron flux based on bibliographic documentation</li>
|
---|
171 |
|
---|
172 | <li>
|
---|
173 | initiate collaboration with French-CEA for stress limit measurement of
|
---|
174 | 6000 type alloy under high level of neutron flux.</li>
|
---|
175 |
|
---|
176 | <li>
|
---|
177 | report on analytic solutions of the Horn thermal/mecanical design</li>
|
---|
178 |
|
---|
179 | <li>
|
---|
180 | start of thermal/mecanical simulation of the Horn for a SuperBeam
|
---|
181 | project</li>
|
---|
182 |
|
---|
183 | <li>
|
---|
184 | first report on electric power design of the Horn for SuperBeam project</li>
|
---|
185 |
|
---|
186 | <li>
|
---|
187 | proposal for Horn prototype building as Design Studies Technical Work Project</li>
|
---|
188 | </ul>
|
---|
189 |
|
---|
190 | <li>
|
---|
191 | Spring 2004</li>
|
---|
192 |
|
---|
193 | <ul>
|
---|
194 | <li>
|
---|
195 | first guide of the collection systems used in the past, present and near
|
---|
196 | future (along R1 publication): mechanical stresses and design, electric
|
---|
197 | power caracteristics and design, heat dissipation system design, failure
|
---|
198 | description, lifetime in operation</li>
|
---|
199 |
|
---|
200 | <li>
|
---|
201 | <font color="#000000">status report of the CERN Horn prototype</font></li>
|
---|
202 |
|
---|
203 | <li>
|
---|
204 | reports on other mechanical tests as diffusion coefficient measurements</li>
|
---|
205 |
|
---|
206 | <li>
|
---|
207 | integration of preliminary TARGET parameters on thermal/mecanical simulation
|
---|
208 | of the Horn for a SuperBeam project</li>
|
---|
209 |
|
---|
210 | <li>
|
---|
211 | first drawing design of a new Horn prototype</li>
|
---|
212 | </ul>
|
---|
213 |
|
---|
214 | <li>
|
---|
215 | Summer 2004</li>
|
---|
216 |
|
---|
217 | <ul>
|
---|
218 | <li>
|
---|
219 | R1 repport production</li>
|
---|
220 |
|
---|
221 | <li>
|
---|
222 | status report on thermo/mechanical simulations</li>
|
---|
223 |
|
---|
224 | <li>
|
---|
225 | status report on electric power design to deliver 300kA/50Hz</li>
|
---|
226 | </ul>
|
---|
227 |
|
---|
228 | <li>
|
---|
229 | Spring 2005</li>
|
---|
230 |
|
---|
231 | <ul>
|
---|
232 | <li>
|
---|
233 | first result on stress limit measurement of irradiated materials</li>
|
---|
234 |
|
---|
235 | <li>
|
---|
236 | final design of a new Horn prototype to launch realisation</li>
|
---|
237 | </ul>
|
---|
238 | </ul>
|
---|
239 | Afterwards their will be prototype realisation by the Design Studies TWP
|
---|
240 | and measurement campain that will end by the writing of R2. Then, new work
|
---|
241 | will be undertaken by DS TWP in the line of R3 report goal.
|
---|