Version 7 (modified by 18 years ago) (diff) | ,
---|
Introduction
TracNav
CROC
Status of the Electronics at the Pit
Front-End Board
Backplane
Radiation Tolerance
- Documents
Table of Contents
Problems identified
- Inversion of the SDA and SCL signal between the LV010 (near RJ45 of the front face of the CROC) and the SPECS Mezzanine connector
- Adaptation of the SPECS Signal in the case when the SPECS Mezzanine is simply a repeater
- Polarisation of the 2 drivers going to the backplane for specs sda- signals. the sda- is not well polarised and the V divider on the +sda simply changes the common mode. This leads to a bad pulse when the command to the driver is released. The sda- pin has to be polarised to GND with for example a 5k resistor. Then the sda+/- signals are well polarised.
CROC proto 3 : Fabrication status
CROC v3 prototypes : present fabrication
CROC | Status | Download version(date) | Comment |
1 | Quick test | ||
2 | - |
Final Number of CROC to be produced
Number of CROC (v3) :
Crate | Croc |
ECAL | 14 = 2x7 |
HCAL | 4 = 2x2 |
PRS | 8 = 2x4 |
Spare | 26 |
Total | 33 |
- Vérifier liste des signaux TTCrq. Voir emprunt TTCvx (Atlas) au LAL