Changes between Version 10 and Version 11 of FEBproto3/synchronisation


Ignore:
Timestamp:
Dec 19, 2005, 9:41:05 PM (20 years ago)
Author:
/C=FR/O=CNRS/OU=UMR8607/CN=Frederic Machefert/emailAddress=machefer@…
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • FEBproto3/synchronisation

    v10 v11  
    55
    66In the following, the green signal is the reference CROC Global clock signal (CROC quartz), the yellow signal
    7 is either the clock of the front-end board, the L0 or the read_command. Green is the trigger for the clock study, the yellow signal is the trigger when looking at the L0 and the Read Command. The time scale is 2ns.
     7is either the clock of the front-end board, the L0 or the read_command. Green is the trigger for the clock study, the yellow signal is the trigger when looking at the L0 and the Read Command. The time scale is 2ns. The scope remanence is pushed to 1s (clock studies) or infinity (L0 and RdCmd) in order to show clearly the jitter effect.
    88
    9 == Djitter Clock ==
     9== Jitter Clock ==
    1010Incoming clock signal taken at the input of the LVDS/unipolar convertor of the board (polarity minus)
    1111
     
    2929
    3030
    31 == Djitter L0 ==
     31== Jitter L0 ==
    3232L0 signal at the output of the LVDS/unipolar convertor of the FEB.
    3333
     
    4040
    4141
    42 == Djitter Read Command ==
     42== Jitter Read Command ==
    4343
    4444First RdCmd at the output of the Sequencer. The First RdCmd is used as the scope trigger. Large djitter wrt