wiki:FEBproto3/synchronisation

Version 4 (modified by machefer, 18 years ago) (diff)

--

FEB proto 3 : Synchronization

In the following, the green signal is the reference CROC Global clock signal (CROC quartz), the yellow signal is either the clock of the front-end board, the L0 or the read_command. Green is the trigger for the clock study, the yellow signal is the trigger when looking at the L0 and the Read Command.

Djitter Clock

Incoming clock signal taken at the input of the LVDS/unipolar convertor of the board (polarity minus) Clock signal taken at the output of the click buffer driver. Clock signal taken at the output of the Delay chip for ADC 0. Clock ADC 0 (polarity +). Clock ADC 0 (polarity -).

Djitter L0

L0 signal at the output of the LVDS/unipolar convertor of the FEB. L0 signal at the output of the Sequencer

Djitter Read Command

First RdCmd at the output of the Sequencer. The First rrdCmd is uned as the scope trigger. Large djitter wrt to the CROC clock. One of the next RdCmd (8?). We have both a djitter wrt the clock (green) but also wrt the first RdCmd still used as the trigger reference.

Attachments (15)

Download all attachments as: .zip